Table of Contents
Table of Contents
Preface
Chapter 1. Confidence Based Scheduling Procedure (CBSP): A Pragmatic Approach to Manage Project Schedule Uncertainty
Paul Poh and Yuk-Miu Lam
Chapter 2. Adoption of Design and Build Procurement Method: An empirical study on Wynn Macau Resort
Vivian W. Y. Tam, Ivan W. H. Fung, John K. W. Chan, and Martin S. K. Yu
Chapter 3. Lean Project Planning: Using Lean Principles in Project Planning
Jan Emblemsvåg
Chapter 4. Monitoring Project Progress: Project Managers’ Perspective
Hussein Abaza, Khalid Siddiqi, Zoran Arsic, and Grifton Passley
Chapter 5. An Annualized Rate of Return Based Concession Duration Model for BOT Contracts
Min Wu, Faisal Arain, and Lyin Shen
Chapter 6. Principle Factors Contributing to Construction Delays in the State of Qatar
Abdulaziz M. Jarkas and Jamal H. Younes
Chapter 7. Perceptions Regarding Greek Construction Project Designers’ Cognitive Abilities, Personality and Knowledge
Georgios N. Aretoulis, Christoforos H. Triantafyllidis, Ioannis K. Anagnostopoulos, and Glykeria P. Kalfakakou
Chapter 8. The Influence of Monitoring and Control on Project Management Success
Maricela I. Montes-Guerra, Faustino N. Gimena, M. Amaya Pérez-Ezcurdia, and H. Mauricio Díez-Silva
Chapter 9. Investigation on the Conflict-Resolving Approaches of the Employees in the Construction Industry
Heyecan Giritli, Duygu Balci, and Begum Sertyesilisik
Chapter 10. Constructing and Financing the Future Energy Infrastructure
Stephen Sewalk and Paul Chinowsky
Index
References
Chapter 1Ang, A. H. S., Abdelnour, J., & Chaker, A. A. (1975). Analysis of activity networks under uncertainty. Journal of the Engineering Mechanics Division: Proceedings of the American Society of Civil Engineers,101(EM4), 373-387. Bowman, R. A. (1995). Efficient estimation of arc criticalities in stochastic activity networks. Management Science 41(1), 58-67.<br>Dodin, B. (1985). Approximating the distribution functions in stochastic networks. Computers & Operations Research, 12 (3), 251-264. Dodin, B. & Elmaghraby, S. E. (1985). Approximating the criticality indices of the activities in PERT networks. Management Science 31(2), 207-223. Eckhardt, R. (1987). Stan Ulam, John von Neumann and the Monte Carlo method. Los Alamos Science Special Issue (15), 131-137.<br>Efron, B. (2004). Bayesian, frequentists, and scientists. Journal of the American Statistical Association, 100</i></b></u>(469), 1-5.<br>Fatemi Ghomi, S. M. T. & Teimouri, E. (2002). Path critical index and activity critical index in PERT networks. </i></b></u><i>European Journal Operational Research</i></b></u>, </i></b></u><i>141</i></b></u>(1), 147-152.<br>Fortin, J., Zielinski, P., Dubois, D. & Fargier, H. (2010). Critical analysis of activity networks under interval uncertainty. </i></b></u><i>Journal of Scheduling, 13</i></b></u>(6), 609-627.<br>Goldstein, M. (2006). Subjective Bayesian analysis: Principle and practice. </i></b></u><i>Bayesian Analysis, 1</i></b></u>(3), 403-420.<br>Gong, D. & Hugsted, R. (1993). Time-uncertainty analysis in project networks with a new merge-event time-estimation technique. </i></b></u><i>International Journal of Project Management</i></b></u>, </i></b></u><i>11</i></b></u>(3), 165-173.<br>Isidore, L. J., Back, E. W. & Fry, G. T. (2001). Integrated probabilistic schedules and estimates from project simulated data. </i></b></u><i>Construction Management and Economics</i></b></u>,</i></b></u><i> 19</i></b></u>, 417-426.<br>Keffer, D. L. & Verdini, W. A. (1993). Better estimation of PERT activity time parameters. </i></b></u><i>Management Science</i></b></u> </i></b></u><i>39</i></b></u>(9), 1086-1091.<br>Khodakarami, V., Fenton, N. & Neil, M. (2007). Project scheduling: Improved approach to incorporate uncertainty using Bayesian networks. </i></b></u><i>Project Management Journal, 38</i></b></u>(2), 39-49.<br>Lu, M. & AbouRizk, S. (2000). Simplified CPM/PERT simulation model. </i></b></u><i>Journal Construction Engineering and Management</i></b></u>, </i></b></u><i>126</i></b></u>(3), 219–226.<br>Martin, J. J. (1965). Distribution of time through a directed acyclic network. </i></b></u><i>Operations Research</i></b></u>, </i></b></u><i>13</i></b></u>, 46-66.<br>Ranasinghe, M. (1994). Quantification and management of uncertainty in activity duration networks. </i></b></u><i>Construction Management and Economics, 12</i></b></u>, 15-29.<br>Sasieni, M. W. (1986). A Note on PERT Times, </i></b></u><i>Management Science</i></b></u>, </i></b></u><i>32</i></b></u>, 1652-1653.<br>Van Slyke, R. M. (1963). Monte Carlo methods and the PERT problem. </i></b></u><i>Operations Research</i></b></u>, </i></b></u><i>11</i></b></u>(5), 839-860.<br>Wang, W. C. & Demsetz, L. A. (2000). Model for evaluating networks under correlated uncertainty – NETCOR, </i></b></u><i>Journal of Construction Engineering and Management</i></b></u>, </i></b></u><i>126</i></b></u>(6), 458-466.<br>Wang, W. C. & Dzeng, R. J. (2005). Applying cluster identification algorithm and simulation to generate network schedules for design projects. </i></b></u><i>Construction Management and Economics, 23</i></b></u>, 199-213.<br>Zhang, H., Tam, C. M. & Shi, J. J. (2002). Simulation-based methodology for project scheduling. </i></b></u><i>Construction Management and Economics, 20</i></b></u>, 667-678.<br><p><b>Chapter 2<br></i></b></u><br>Belassi, W. & Tukel, O. I. (1996). A new framework for determining critical success/failure factors in projects. </i></b></u><i>International Journal of Project Management</i></b></u>. </i></b></u><i>14, </i></b></u>141-151.<br>Chan, A. P. C. (1999). Modelling building durations in Hong Kong. </i></b></u><i>Construction Management and Economics</i></b></u>. </i></b></u><i>17, </i></b></u>189-196.<br>Chan, A. P. C. (2000). Evaluation of enhanced design and build system – a case study of a hospital project. </i></b></u><i>Construction Management and Economics</i></b></u>. </i></b></u><i>18, </i></b></u>863-871.<br>Chan, A. P. C., Ho, D. C. K. & Tam, C. M. (2001). Design and build project success factors: multivariate analysis. </i></b></u><i>Journal of Construction Engineering and Management</i></b></u>. </i></b></u><i>127, </i></b></u>93-100.<br>Chan, A. P. C., Scott, D. & Lam, W. M. E. (2002). Framework of success criteria for design/build projects. </i></b></u><i>Journal of Management in Engineering</i></b></u>. </i></b></u><i>18, </i></b></u>120-128.<br>Chan, J. K. W. & Kwok, Y. Y. (1997). The management of a fast track millennium project in Hong Kong – the chinese cuisine training institute. </i></b></u><i>The Millennium Conference on Construction Project Management</i></b></u>.<br>Chritamera, S. & Ogunlana, S. O. (2001). Problems experienced on design and build projects in Thailand </i></b></u><i>JOurnal of Construction Procurement</i></b></u>. </i></b></u><i>7, </i></b></u>73-86.<br>Construction Industry Research and Information Association (1985). </i></b></u><i>Faster construction on site by selection of methods and materials</i></b></u>. Construction Industry Research and Information Association.<br>Diallo, A. & Thuillier, D. (2005). The success of international development projects, trust and communication: an african perspective. </i></b></u><i>International Journal of Project Management</i></b></u>. </i></b></u><i>23, </i></b></u>237-252.<br>Ernzen, J. J. & Schexnayder, C. (2000). One company’s experience with design/build: labour cost risk and profit potential. </i></b></u><i>Journal of Construction Engineering and Management</i></b></u>. </i></b></u><i>126, </i></b></u>10-14.<br>Hatush, Z. & Skitmore, R. M. (1997). Evaluating contractor prequalification data: selection criteria and project success factors. </i></b></u><i>Construction Management and Economics</i></b></u>. </i></b></u><i>15, </i></b></u>129-147.<br>Lam, W. M. E., Chan, A. P. C. & Chan, W. M. D. (2002). Development of the design-build procurement system in Hong Kong. </i></b></u><i>Architectural Science Review</i></b></u>. </i></b></u><i>47, </i></b></u>387-397.<br>Lim, C. S. & Mohamed, M. Z. (1999). Criteria of project success: an exploratory re-examination </i></b></u><i>International Journal of Project Management</i></b></u>. </i></b></u><i>17, </i></b></u>243-248.<br>Ling, F. Y. Y., Chan, S. L., Chong, E. & Fu, L. P. (2004). Predicting performance of design-build and design-bid-build projects. </i></b></u><i>Journal of Construction Engineering and Management</i></b></u>. </i></b></u><i>130, </i></b></u>75-83.<br>Mok, Y. Y. C. (2004). Study on the housing market in Macau after the liberalization of the gambling industry: a cross reference with Las Vegas’s experience. Hong Kong, China, The Hong Kong Polytechnic University.<br>Songer, A. D. & Molenaar, K. R. (1997). Project characteristics for successful public-sector design-build. </i></b></u><i>Journal of Construction Engineering and Management</i></b></u>. </i></b></u><i>123, </i></b></u>34-40.<br>Songer, A. D., Molenaar, K. R. & Robinson, G. D. (1996). </i></b></u><i>Selection factors and success criteria for design-build in the U.S. and U. K.</i></b></u> Longman.<br>Tam, C. M. (2000). Design and build on a complicated redevelopment project in Hong Kong: the Happy Valley racecourse redevelopment. </i></b></u><i>International Journal of Project Management</i></b></u>. </i></b></u><i>18, </i></b></u>125-129.<br>Turner, D. (1994). </i></b></u><i>Design and build contract practice</i></b></u>. Longman.<br><p><b>Chapter 3<br></i></b></u><br>Abdelhamid, T. S., M. A. El-Gafy and O. Salem (2008). “Lean construction: Fundamentals and principles.” </i></b></u><i>The American Professional </i></b></u><i>Constructor Journal,</i></b></u> 32(2):pp. 8-19.<br>Austin, J. L. (1975). </i></b></u><i>How to Do Things With Words</i></b></u>. Cambridge, MA, Harvard University Press.p. 169.<br>Baldoni, J. (2004). Avoiding Miscommunications. Darwin Magazine:pp. www.darwinmag.com.<br>Ballard, H. G. (2000). </i></b></u><i>The Last Planner System of Production Control</i></b></u>. Faculty of Engineering. Birminghan, The University of Birmingham. PhD Dissertation:pp. 191.<br>Ballard, H. G. and G. A. Howell (1994). Stabilizing Work Flow. </i></b></u><i>Proceedings of the 2nd Annual Conference of the International Group for Lean Construction</i></b></u>. Santiago, Chile:pp. 101-110.<br>Ballard, H. G. and G. A. Howell (1998). “Shielding Production: Essential Step in Production Control.”</i></b></u><i> Journal of Construction Engineering and Project Management</i></b></u>,124(1):pp. 11-17.<br>Ballard, H. G. and G. A. Howell (2004). “Competing Construction Management Paradigms.” </i></b></u><i>Lean Construction Journal</i></b></u>, 1(1):pp. 38-45.<br>Bohm, D. J. (1993). “For Truth Try Dialogue.” </i></b></u><i>Resurgence</i></b></u>, 13(No. 156, January/February):pp. 10-13.<br>Bohm, D. J. (2004). </i></b></u><i>On Dialogue</i></b></u>. London, Routledge.p. 101.<br>Bonvik, A. M. and S. B. Gershwin (1996). Beyond kanban: creating and analyzing lean shop-floor control policies. </i></b></u><i>Manufacturing and Service Management Conference Proceedings</i></b></u>, Hannover, NH.<br>Cavusgil, S. T., R. J. Calantone and Y. Zhao (2003). “Tacit knowledge transfer and firm innovation capability.” </i></b></u><i>Journal of Business & Industrial Marketing</i></b></u>, 18(1):pp. 6-21.<br>Cialdini, R. B. (2001). </i></b></u><i>Influence: Science and practice.</i></b></u> Upper Saddle River, NJ, Pearson.p. 262.<br>Davidson, F. J. (2002). </i></b></u><i>The New Project Management: Tools for an Age of Rapid Change, Complexity and Other Business Realities, </i></b></u>San Francisco, CA, Jossey-Bass.p. 384.<br>De Geus, A. P. (1988). “Planning as Learning.” </i></b></u><i>Harvard Business Review</i></b></u>, 66(March-April):pp. 70-74.<br>Dinero, D. A. (2005). </i></b></u><i>Training Within Industry: The Foundation of Lean</i></b></u>. New York, CRC Press.p. 329.<br>Fleming, Q. W. and J. M. Koppelman (2005). </i></b></u><i>Earned Value Project Management</i></b></u>. Newtown Square, PA, Project Management Institute.p. 232.<br>Habermas, J. (2003). </i></b></u><i>On the Pragmatics of Communication.</i></b></u> Cambridge, Polity Press.p. 454.<br>Honderich, T., Ed. (1995).</i></b></u><i> The Oxford Companion to Philosophy</i></b></u>. New York, Oxford University Press.p. 1009.<br>Hopp, W. J. and M. L. Spearman (2004). “To Pull or Not to Pull: What Is the Question?” </i></b></u><i>Manufacturing & Service Operations Management</i></b></u>, 6(2 Spring):pp. 133-148.<br>Inman, R. R. (1993). “Inventory is the </i></b></u><i>flower </i></b></u>of all evil.” </i></b></u><i>Production and Inventory Management Journal, </i></b></u>34(4):pp. 41-45.<br>Jackson, T. L. (2006). </i></b></u><i>Hoshin Kanri for the Lean Enterprise: Developing Competitive Capabilities and Managing Profit</i></b></u>. New York, Productivity Press.p. 206.<br>Johnson-Laird, P. N. (1983).</i></b></u><i> Mental Models</i></b></u>. Cambridge, Cambridge University Press.p. 528.<br>Jørgensen, H. H., L. Owen and A. Neus (2008). </i></b></u><i>Making Change Work</i></b></u>. Somers, NY, IBM Global Business Service Strategy & Change Practice, IBM Corporation.p. 46.<br>Kahneman, D. and A. Tversky (1982). Intuitive Prediction: Biases and Corrective Procedures. </i></b></u><i>Judgment Under Uncertainty: Heuristics and Biases</i></b></u>. D. Kahneman, P. Slovic and A. Tversky. London, Cambridge University Press:pp. 414-421.<br>Kim, Y.-W. and H. G. Ballard (2000). Is the Earned Value Method and Enemy of Work Flow? </i></b></u><i>Proceedings of the 8th International Group for Lean Construction Conference</i></b></u>, Brighton, UK, International Group for Lean Construction.<br>Koskela, L. (1992). </i></b></u><i>Application of the New Production Philosophy to Construction</i></b></u>. Standford, CA, Stanford University, Center for Integrated Facility Engineering.p. 75.<br>Koskela, L. (1999). Management of Production in Construction: A Theoretical View. </i></b></u><i>Proceedings of the 7th Annual Conference of the International Group for Lean Construction</i></b></u>. I. D. Tommelein. University of California, Berkeley, CA:pp. 241-252.<br>Koskela, L. (2000). </i></b></u><i>An Exploration Towards A Production Theory And Its Application Co Construction</i></b></u>. VTT Publications 408. Espoo, Technical Research Center of Finland. PhD Dissertation:pp. 296.<br>Koskela, L. and P. Huovila (1997). On Foundations of Concurrent Engineering. </i></b></u><i>Concurrent Engineering in Construction CEC97</i></b></u>. C. Anumba. London, The Institution of Structural Engineers:pp. 22-32.<br>Krishnamurthy, A. and R. Suri (2000). </i></b></u><i>Re-examining the Performance of Push, Pull and Hybrid Material Control Strategies for Multi-product Flexible Manufacturing Systems</i></b></u>. Madison, WI, Center for Quick Response Manufacturing, University of Wiscounsin-Madison.p. 28.<br>Laufer, A. and G. A. Howell (1993). “Construction Planning: Revising the Paradigm.” </i></b></u><i>Project Management Journal</i></b></u>, 24(3):pp. 23-33.<br>Laufer, A. and R. L. Tucker (1987). “Is construction project planning really doing its job? A critical examination of focus, role and processes.” </i></b></u><i>Construction Management and Economics</i></b></u>, 5(3):pp. 243-266.<br>Laufer, A. and R. L. Tucker (1988). “Competence and timing dilemma in construction planning.” </i></b></u><i>Construction Management and Economics</i></b></u>, 6(4):pp. 339-355.<br>Niebuhr, R. (1932). </i></b></u><i>Moral Man & Immoral Society: A Study of Ethics and Politics</i></b></u>. London, Westminister John Knox Press.p. 284.<br>Nonaka, I. and H. Takeuchi (1995). </i></b></u><i>The Knowledge-Creating Company: How Japanese Companies Creat the Dynamics of Innovation</i></b></u>. New York, Oxford University Press.p. 298.<br>Nutt, P. (1998). “Leverage, Resistance and the Success of Implementation Approaches.” </i></b></u><i>Journal of Management Studies</i></b></u>, 35(2):pp. 213-240.<br>Oehmen, J., Ed. (2012). </i></b></u><i>The Guide to Lean Enablers for Managing Engineering Programs, Version 1.0</i></b></u>. Cambridge, MA, Joint MIT-PMI-INCOSE Community of Practice on Lean in Program management.p. 202.<br>PMI (2008). </i></b></u><i>A Guide to the Project Management Body Of Knowledge (PMBOK Guide)</i></b></u>. Newtown Square, PA, Project Management Institute.p. 467.<br>Polanyi, M. (1966). </i></b></u><i>The Tacit Dimension</i></b></u>. New York, Anchor Day Books.p. 108.<br>Powner, D. A. (2008). </i></b></u><i>OMB And Agencies Need to Improve Planning, Management, and Oversight of Projects Totaling Billions of Dollars</i></b></u>. Washington DC, United States Government Accountability Office (GAO).p. 50.<br>Richards, C. W. (2003). </i></b></u><i>A Swift, Elusive Sword: What If Sun Tzu and John Boyd Did a National Defense Review.</i></b></u> Washington DC, Center for Defense Information.p. 88.<br>Sanvido, V. E. (1984). </i></b></u><i>Designing Productivity Management And Control Systems For Construction Projects</i></b></u>. Department of Civil Engineering. Standford, CA, Stanford University:pp. 206.<br>Slomp, J., J. A. C. Bokhorst and R. Germs (2009). “A lean production control system for high-variet/low-volume environments: a case study implementation.” </i></b></u><i>Production Planning & Control, </i></b></u>20(7):pp. 586-595.<br>Sumara, J. and J. Goodpasture (1997). Earned Value – The Next Generation – A Practical Application for Commercial Projects. </i></b></u><i>Project Management Institute 28th Annual Seminars & Symposium</i></b></u>. Chicago, IL, Project Management Institute:pp. 13-17.<br>Sussland, W. A. (2002). “Connecting the Planners and Doers.” </i></b></u><i>Quality Progress</i></b></u> (June):pp. 55-61.<br>Sveiby, K. E. (1997). </i></b></u><i>The New Organizational Wealth – Managing & Measuring Knowledge-Based Assets.</i></b></u> Brisbane, Berret-Koehler Publishers, Inc.p. 275.<br>Taguchi, G., S. Chowdhury and Y. Wu (2005). </i></b></u><i>Taguchi’s Quality Engineering Handbook</i></b></u>. Hoboken, NJ, John Wiley & Sons.p. 1662.<br>Yong-Woo, K. and H. G. Ballard (2000). Is the Earned Value Method and Enemy of Work Flow? </i></b></u><i>Proceedings of the 8th annual conference of the International Group for Lean Construction</i></b></u>. Brighton:pp. 10.<br><p><b>Chapter 4<br></i></b></u><br>D. Schatteman & et al. (2008). Methodology for Integrated Risk Management and Proactive Scheduling of Construction Projects. </i></b></u><i>ASCE – Journal of Construction Engineering and Management</i></b></u>, November issue, 885-893.<br>Dunn, T (2005). Strategies for creating accurate updates of CPM construction schedules. </i></b></u><i>Proceedings of the 2005 American Society for Engineering Education Annual Conference & Exposition</i></b></u>. Session 2247.<br>GSA, 2012; Contractor’s Request for Progress Payment, </i></b></u><i>General Service Administration Forms Library</i></b></u>, http://www.gsa.gov/portal/forms/download.<br>Jack, G. (1995). </i></b></u><i>Construction Scheduling Games and Ways to Win. </i></b></u>Paper presented at the Primavera Users’ Group, Los Angeles.<br>Kennemer, B. (2002). </i></b></u><i>Understanding Project’s Percent Complete vs. Percent Work Complete</i></b></u>. PMI. Online article. www.techrepublic.com/…/understanding-projects-percent-complete-v.<br>Korman, R. (2003) </i></b></u><i>Critics can’t find the Logic in Many of Today’s CPM Schedule. </i></b></u>Engineering News Record, May 26. Cover story.<br>Kupakuwana P. & van der Berg, G (2005). The Goalposts for Project Success Have Moved — a Marketing View. </i></b></u><i>AACE International, Cost Engineering Journal</i></b></u>, Vol. 47/No. 5 MAY 2005 p 28-34.<br>Newitt, J. (2010). </i></b></u><i>Construction Scheduling</i></b></u>. 2</i></b></u>nd</i></b></u> Edition, London. Pearson Education Ltd. <br>Paul, J. & Glavinich, T. (2008). </i></b></u><i>Construction Planning & Scheduling</i></b></u>, 2</i></b></u>nd</i></b></u> edition. The Associated General Contractors of America. Arlington, USA.<br>Peteiro, D. (2006). Traditional Management and Process Management. </i></b></u><i>GestioPolis,</i></b></u> </i></b></u><i>September 12, 2006.</i></b></u> Online Journal, http://www.gestiopolis.com/recursos4/docs/ger/gestitra.htm.<br>Rothman,J (2007). </i></b></u><i>Managing it;</i></b></u> </i></b></u><i>Your Guide to Modern Pragmatic Project Management</i></b></u>. Frisco, Tx. The Pragmatic Programmers.<br>Schroeder, R. (1992). </i></b></u><i>Administración de Operaciones</i></b></u> (3rd. Edition ). Mexico, Mc Graw Hill. <br>Vanhoucke, M. & Van de Voorde, S. (2007). A Simulation and Evaluation of Earned Value Metrics to Forecast Project Duration. </i></b></u><i>Journal of the Operations Research Society, </i></b></u>Vol. 58, p 1361-1374.<br>Walt, L (2008). Project Duration Forecasting: Comparing Earned Value Management Method Earned Schedule. </i></b></u><i>Journal of Defense Software Engineering</i></b></u>; Vol. 2, No. 12, p 10-15.<br><p><b>Chapter 5<br></i></b></u><br>Bakatjan, S., Arikan, M., & Tiong, R. L. K., (2003). Optimal capital structure model for BOT power projects in Turkey. </i></b></u><i>J. Constr. Eng.</i></b></u> </i></b></u><i>Manage.</i></b></u>, </i></b></u><i>129</i></b></u>(1), 89–97.<br>China Daily (2011). Listed real estate firms bidding actively for industrialized housing. http://www.chinadaily.com.cn/hqgj/jryw/2011-01-26/content_1654072.html, retrieved on March 21, 2011 (in Chinese).<br>Gruneberg, S. L., (1997). </i></b></u><i>Construction economics: an introduction</i></b></u>. Basingstoke, Macmillan.<br>Kang, C.C., Feng, C. M., & Khan, H. A., (2005). Risk assessment for build-operate-transfer projects: A dynamic multi-objective programming approach. </i></b></u><i>Comput. Oper. Res.</i></b></u>, </i></b></u><i>32</i></b></u>(6), 1633–1654.<br>Kumaraswamy, M.M., & Zhang, X.Q., (2001). Governmental role in BOT-led infrastructure development. </i></b></u><i>Int. J. Proj. Manage.</i></b></u>, </i></b></u><i>19</i></b></u>(4), 195–205.<br>Levy, S. M. (1996). </i></b></u><i>Build, operate, transfer: Paving the way for tomorrow’s infrastructure</i></b></u>. Wiley, New York, 18–21.</i></b></u><i><br></i></b></u>Lokiec, F., & Kronenberg, G. (2003). South Israel 100 million m3/y seawater desalination facility: Build, operate, and transfer (BOT) project. </i></b></u><i>Desalination</i></b></u>, </i></b></u><i>156</i></b></u>(1), 29–37.<br>Nigel, S., Zhao, H., & Zhu, Y. (2004). The Huaibei power plant and its implications for the Chinese BOT market. </i></b></u><i>Int. J. Proj. Manage.</i></b></u>, </i></b></u><i>22</i></b></u>(5), 407–413.<br>Shen, L. Y., Li, H., & Li, Q. M. (2002). Alternative concession model for build operate transfer contract projects. </i></b></u><i>J. Constr. Eng. Manage.</i></b></u>, </i></b></u><i>128</i></b></u>(4), 326–330.<br>Shen, L. Y., and Wu, Y. Z., 2005. “Risk concession model for build operate transfer contract projects.” </i></b></u><i>J. Constr. Eng. Manage.</i></b></u>, </i></b></u><i>131</i></b></u>(2), 211–220.<br>Shen, L. Y., Bao, H.J., Wu, Y.Z., & W.S. Lu (2007). Using bargaining-game theory for negotiating concession period for BOT-tye contract. </i></b></u><i>J. Constr. Eng. Manage.</i></b></u>, </i></b></u><i>133</i></b></u>(5), 385–392.<br>Subprasom, K. & Chen, A., (2007). Effects of regulation on highway pricing and capacity choice of a build-operate-transfer scheme.</i></b></u><i> J. Constr. Eng. Manage.</i></b></u>, </i></b></u><i>133</i></b></u>(1), 64-71.<br>Tiong L. K., (1995). Risks and Guarantees in BOT Tender. </i></b></u><i>J. Constr. Eng. Manage.</i></b></u>, </i></b></u><i>121 </i></b></u>(2), 183-188.<br>Tiong, R. L. K., (1996). CSFs in competitive tendering and negotiation model for BOT projects. </i></b></u><i>J. Constr. Eng. Manage.</i></b></u>, </i></b></u><i>122</i></b></u>(3), 205–211.<br>Tiong, R. L. K., & Alum, J., (1997a). Financial commitments for BOT projects. </i></b></u><i>Int. J. Proj. Manage.</i></b></u>, </i></b></u><i>15</i></b></u>(2), 73–78.<br>Tiong, R. L. K., & Alum, J., (1997b). Final negotiation in competitive BOT tender. </i></b></u><i>J. Constr. Eng. Manage.</i></b></u>, </i></b></u><i>123</i></b></u>(1), 6–10.<br>Wang, S. Q., Tiong, R. L. K., Ting, S. K., & Ashley, D., (1999). Political risks analysis of key contract clauses in China’s BOT project. </i></b></u><i>J. Constr. Eng. Manage.</i></b></u>, </i></b></u><i>125</i></b></u>(3), 190–197.<br>Wu M., Chau K. W., Shen Q. P. & Shen L. Y. (2012). A Net Asset Value Based Concession Duration Model for BOT Contracts. </i></b></u><i>J. Constr. Eng. Manage.</i></b></u>, </i></b></u><i>138</i></b></u> (2), pp. 304-308.<br>Wu M., Chau K. W. & Shen Q. P. (2011a). Discussion of “Employing the net present value-consistent IRR methods for PFI contracts” by Y. H. Chiang; Eddie W. L. Cheng; and Patrick T. I. Lam. </i></b></u><i>J. Constr. Eng. Manage.</i></b></u>, </i></b></u><i>137</i></b></u> (6), 472-474.<br>Wu M., Chau K. W. & Shen Q. P.(2011b). Discussion of “win-win concession period determination methodology” by Xueqing Zhang. </i></b></u><i>J. Constr. Eng. Manage.</i></b></u>, </i></b></u><i>137</i></b></u> (6), pp.471-471.<br>Yang, H., and Meng, Q., (2000). Highway pricing and capacity choice in a road network under a build-operate-transfer scheme. </i></b></u><i>Transp. Res.,</i></b></u> </i></b></u><i>Part A: Policy Pract.</i></b></u>, </i></b></u><i>34</i></b></u>(3), 207–222.<br>Zhang, X. Q., & Kumaraswamy, M. M., (2001). Hong Kong experience in managing BOT projects. </i></b></u><i>J. Constr. Eng. Manage.</i></b></u>, </i></b></u><i>127</i></b></u>(2), 154–162.<br><p><b>Chapter 6<br></i></b></u><br>Abd El-Razek, M., Bassioni, H., & Mobarak, A. (2008). Causes of Delays in Building Construction Projects in Egypt. </i></b></u><i>ASCE Journal of Construction Engineering and Management</i></b></u>, </i></b></u><i>134</i></b></u>(11), 831-841.<br>Abdullah, M., Rahman, I., & Abdul Aziz, A. (2010). Causes of Delay in MARA Management Procurement Construction Projects. </i></b></u><i>Journal of Surveying, Construction & Property</i></b></u>, </i></b></u><i>1</i></b></u>(1), 123-138.<br>Ahmed, S., Azhar, S., Kappagntula, P., & Gollapudil, D. (2003). Delays in Construction: A Brief Study of Florida Construction Industry. </i></b></u><i>In</i></b></u>: </i></b></u><i>Proceedings of the 39</i></b></u><i>th</i></b></u><i> Annual ASC Conference</i></b></u>, 10-12 April 2003, Clemson University, SC, USA, 257-266.<br>Aibinu, A. & Jagboro, G. (2002). The Effects of Construction Delays on Project Delivery in Nigerian Construction Industry. </i></b></u><i>International Journal of Project Management</i></b></u>, </i></b></u><i>20</i></b></u>(8), 593-599.<br>Alaghbari, W., Kadir, M., Salim, A., & Ernawati (2007). The Significant Factors Causing Delay of Building Construction Projects in Malaysia. </i></b></u><i>Engineering, Construction and Architectural Management</i></b></u>, </i></b></u><i>14</i></b></u>(2), 192-206.<br>Al-Kharashi, A. & Skitmore, M. (2009). Causes of Delays in Saudi Arabian Public Sector Construction Projects. </i></b></u><i>Construction Management and Economics</i></b></u>, </i></b></u><i>27</i></b></u>(1), 3-23.<br>Al-Momani, A. (2000). Construction Delay: A Quantitative Analysis. </i></b></u><i>International Journal of Project Management</i></b></u>, </i></b></u><i>18</i></b></u>(1), 51-59.<br>Al-Tabtabai, H. (2002). Causes for Delays in Construction Projects in Kuwait. </i></b></u><i>Engineering Journal of Qatar University</i></b></u>, </i></b></u><i>15</i></b></u>, 19-37.<br>Arditi, D., Akan, G., & Gurdamar, S. (1985). Reasons for Delays in Public Projects in Turkey. </i></b></u><i>Construction Management and Economics</i></b></u>, </i></b></u><i>3</i></b></u>(2), 171-181.<br>Asnaashari, E., Farahani, S., Hoseini, A., Kight, A., & Hurst, A. (2009). Causes of Delay in Iran Construction Projects. </i></b></u><i>5</i></b></u><i>th</i></b></u><i> International Conference on Construction in the 21</i></b></u><i>st</i></b></u><i> Century</i></b></u>, 20-22 May 2009, “Collaboration and Integration in Engineering, Management and Technology,” Istanbul, Turkey.<br>Assaf, S. & Al-Hejji, S. (2006). Causes of Delay in Large Construction Projects. </i></b></u><i>International Journal of Project Management</i></b></u>, </i></b></u><i>24</i></b></u>(4), 349-357.<br>Assaf, S., Al-Khalil, M., & Al-Hazmi, M. (1995). Causes of Delays in Large Building Construction Projects. </i></b></u><i>ASCE Journal of Management in Engineering</i></b></u>, </i></b></u><i>11</i></b></u>(2), 45-50.<br>Baldwin, J., Manthei, J., Rothbart, H., & Harris, R. (1971). Causes of Delay in the Construction Industry. </i></b></u><i>ASCE Journal of the Construction Division</i></b></u>, </i></b></u><i>97</i></b></u>(CO2), 177-187. <br>Bolton, J. (1990). </i></b></u><i>Type of Claims, Construction and Disruption Claims</i></b></u>: Course Manual. London, UK: Portman Inter-Continental.<br>Bramble, B. & Callahan, M. (1987). </i></b></u><i>Construction Delay Claims</i></b></u>. NY, USA: John Wiley & Sons.<br>Chan, D. & Kumaraswamy, M. (1997). A Comparative Study of Causes of Time Overruns in Hong Kong Construction Projects. </i></b></u><i>International Journal of Project Management</i></b></u>, </i></b></u><i>15</i></b></u>(1), 55-63<br>CIA (2011). </i></b></u><i>Qatar Economy</i></b></u>. United States Central Intelligence Agency (CIA). World Factbook. www.theodora.com/wfbcurrent/qatar/qatar_economy.html<br>CII (1986). </i></b></u><i>Constructability: A primer</i></b></u>. Construction Industry Institute (CII), Publication </i></b></u><i>3</i></b></u>-1: University of Texas at Austin, TX, USA.<br>Construction Week (2010). </i></b></u><i>Qatar 2022 World Cup Facts for Contractors</i></b></u>, 09 December 2010. www.constructionweekonline.com/article-10407-22-qatar-2022-world-cup-facts-for-contractors <br>Emmerson, H. (1962). </i></b></u><i>Survey of Problems before the Construction Industries</i></b></u>. London, UK: HMSO, Ministry of Works.<br>Enshassi, A., Al-Najjar, J., & Kumaraswamy, M. (2009). Delays and Cost Overruns in the Construction Projects in the Gaza Strip. </i></b></u><i>Journal of Financial Management of Property and Construction</i></b></u>, </i></b></u><i>14</i></b></u>(2), 126-151.<br>Enshassi, A., Mohamed, S., Abu Mustafa, Z., & Mayer, P. (2007). Factors Affecting Labour Productivity in Building Projects in the Gaza Strip. </i></b></u><i>Journal of Civil Engineering and Management</i></b></u>, </i></b></u><i>13</i></b></u>(4), 245-254.<br>Faridi, A. & El-Sayegh, S. (2006). Significant Factors Causing Delay in the UAE Construction Industry. </i></b></u><i>Construction Management and Economics</i></b></u>, </i></b></u><i>24</i></b></u>(11), 1167-1176.<br>Fisk, E. (1988). </i></b></u><i>Construction Project Administration</i></b></u>: (3</i></b></u>rd</i></b></u> Edition). NY, USA: John Wiley & Sons.<br>Frimpong, Y., Oluwoye, J., & Crawford, L. (2003). Causes of Delay and Cost Overruns in Construction of Groundwater Projects in Developing Countries: Ghana as a Case Study. </i></b></u><i>International Journal of Project Management</i></b></u>, </i></b></u><i>21</i></b></u>(5), 321-326.<br>Fugar, F. & Agyakwah-Baah, A. (2010). Delays in Building Construction Projects in Ghana. </i></b></u><i>Australasian Journal of Construction Economics and Building</i></b></u>, </i></b></u><i>10</i></b></u>(1/2), 103-116.<br>Iyer, K. & Sagheer, M. (2012). Optimization of Bid-Winning Potential and Capital Structure for Build-Operate-Transfer Road Projects in India. </i></b></u><i>ASCE</i></b></u> </i></b></u><i>Journal of Management in Engineering</i></b></u>, </i></b></u><i>28</i></b></u>(2), 104-113.<br>Jarkas, A. & Bitar, C. (2012). Factors Affecting Construction Labor Productivity in Kuwait, </i></b></u><i>ASCE</i></b></u> </i></b></u><i>Journal of Construction Engineering and Management</i></b></u>, </i></b></u><i>138</i></b></u>(7), 811-820.<br>Kaming, P., Olomolaiye, P., Holt, G., & Harris, F. (1997). Factors Influencing Construction Time and Cost Overruns on high-rise Projects in Indonesia. </i></b></u><i>Construction Management and Economics</i></b></u>, </i></b></u><i>15</i></b></u>(1), 83-94.<br>Kometa, S., Olomolaiye, P., & Harris, F. (1994). Attributes of UK Construction Clients Influencing Project Consultants’ Performance. </i></b></u><i>Construction Management and Economics</i></b></u>, </i></b></u><i>12</i></b></u>(5), 433-443.<br>Koushki, P., Al-Rashid, K., & Kartam, N. (2005). Delays and Cost Increases in the Construction of Private Residential Projects in Kuwait. </i></b></u><i>Construction Management and Economics</i></b></u>, </i></b></u><i>23</i></b></u>(3), 285-294.<br>Kumaraswamy M. & Chan, D. (1995). Determinants of Construction Duration. </i></b></u><i>Construction Management and Economics</i></b></u>, </i></b></u><i>13</i></b></u>(3), 209-217.<br>Le-Hoai, L., Lee, Y., & Lee, J. (2008). Delays and Cost Overruns in Vietnam Large Construction Projects: A Comparison with other Selected Countries. </i></b></u><i>KSCE Journal of Civil Engineering</i></b></u>, </i></b></u><i>12</i></b></u>(6), 367-377.<br>Mahamid, I., Bruland, A., & Dmaidi, N. (2012). Delay causes in Road Construction Projects. </i></b></u><i>ASCE</i></b></u> </i></b></u><i>Journal of Management in Engineering</i></b></u>, </i></b></u><i>28</i></b></u>(3), 300-310.<br>Mansfield, N., Ugwu, O., & Doran, T. (1994). Causes of Delay and Cost Overruns in Nigerian Construction Projects. </i></b></u><i>International Journal of Project Management</i></b></u>, </i></b></u><i>12</i></b></u>(4), 254-260.<br>Mezher, T. & Tawil, W. (1998). Causes of Delays in the Construction Industry in Lebanon. </i></b></u><i>Engineering, Construction and Architectural Management</i></b></u>, </i></b></u><i>5</i></b></u>(3), 252-260.<br>Mutaleb, O. & Kishk, M. (2010). An Investigation into Causes and Effects of Construction Delays in UAE. </i></b></u><i>In</i></b></u>: Egbu, C. (Ed) </i></b></u><i>Proceedings of the 26</i></b></u><i>th</i></b></u><i> Annual ARCOM Conference</i></b></u>, 6-8 September 2010, Leeds, UK, 1149-1157.<br>Nunnaly, J. (1978). </i></b></u><i>Psychometric Theory</i></b></u>. NY, USA: McGraw-Hill.<br>Odeh, A. & Battaineh, H. (2002). Causes of Construction Delay: Traditional Contracts. </i></b></u><i>International Journal of Project Management</i></b></u>, </i></b></u><i>20</i></b></u>(1), 67-73.<br>Qatar Weather (2011). www.qatar-weather.com.<br>QER (2004). </i></b></u><i>Gross Domestic Product, Qatar Economic Review (QER)</i></b></u>. Qatar National Bank, Economic Information Presented by the Permanent Mission of the State of Qatar to the United Nations Office in Geneva. www.qatarmission.ch/gross_domestic_product.html<br>Samantha, I. (2002). </i></b></u><i>An Overview of Construction Claims: How They Arise and How to Avoid Them</i></b></u>. Clark Wilson LLP, BC, Canada. www.cwilson.com/publications/construction/construction-claims.pdf.<br>Samba (2009). </i></b></u><i>Qatar Update: A Bright Economic Outlook</i></b></u>. Report Series, Samba Financial Group. www.samba.com/gbldocs/qatar_update_eng.pdf.<br>Sambasivan, M. & Soon, Y. (2007). Causes and Effects of Delays in Malaysian Construction Industry. </i></b></u><i>International Journal of Project Management</i></b></u>, </i></b></u><i>25</i></b></u>(5), 517-526.<br>Sweis, G., Sweis, R., Abu Hammad, A., & Shboul, A. (2008). Delays in Construction Projects: The Case of Jordan. </i></b></u><i>International Journal of Project Management</i></b></u>, </i></b></u><i>26</i></b></u>(6), 665-674.<br>The Peninsula (2011). </i></b></u><i>Qatar – Real GDP to Grow 20% this Year</i></b></u>. Qatar National Bank, QNB Capital, MENA Financial News, 10 April 2011. www.menafn.com/qn_news_story_s.asp?storyid=1093404864<br>Toor, S. & Ogunlana, S. (2008). Problems Causing Delays in Major Construction Projects in Thailand. </i></b></u><i>Construction Management and Economics</i></b></u>, </i></b></u><i>26</i></b></u>(4), 395-408.<br>Tumi, S., Omran, A., & Pakir, A. (2009). Causes of Delay in Construction Industry in Libya. </i></b></u><i>The International Conference on Economics and Administration</i></b></u>, 14-15 November 2009. Faculty of Administration and Business, University of Bucharest, Romania, 265-272.<br><p><b>Chapter 7<br></i></b></u><br>Abidin, N., & Daud, S. (2012). Personality Traits: Business versus Technical Graduates. </i></b></u><i>Communications of the IBIMA</i></b></u>,</i></b></u><i> 2012, </i></b></u>1-15.<br>Amabile, T.M., Schatzel, E.A., Moneta, G.B., & Kramer, S.J. (2004). Leader behaviors and the work environment for creativity: perceived leader support. </i></b></u><i>The Leadership Quarterly, 15</i></b></u>(1), 5–32.<br>Archer, B. (1968). The structure of the design process. In Moore, G.T. (Eds.), </i></b></u><i>Emerging Methods in Environmental Design and Planning </i></b></u>(pp.285-307). Cambridge: MIT Press.<br>Atkinson, A.R., & Westall, R. (2010). The relationship between integrated design and construction and safety on construction projects. </i></b></u><i>Construction Management and Economics, 28</i></b></u>(9), 1007-1017.<br>Badawy, M. K. (1981). How to succeed as a manager: Why the switch from engineer to manager is difficult. </i></b></u><i>Machine Design, 53</i></b></u>(10), 91-95.<br>Baldwin, A.N., Austin, S.A., Hassan T.M., & Thorpe A. (1999). Modelling information flow during the conceptual and schematic stages of building design. </i></b></u><i>Construction Management and Economics, 17</i></b></u>(2), 155-167.<br>Benator, B., & Thumann, A. (2003). </i></b></u><i>Project Management and Leadership Skills for Engineering and Construction Projects.</i></b></u> New York: Marcel Dekker, Inc.<br>Boyd, D., & Bentley, D. (2012). A critique of conceptions of design and management in construction projects. </i></b></u><i>Construction Management and Economics, 30</i></b></u>(6), 441-454.<br>Bubshait, A.A., Farooq, G., Jannadi, M.O., & Assaf, S.A. (1999). Quality practices in design organizations. </i></b></u><i>Construction Management and Economics, 17</i></b></u>(6), 799-809.<br>Carr, P.G. (2000). </i></b></u><i>An Investigation of the Relationship between Personality Traits and Performance for Engineering and Architectural Professionals Providing Design Services to the Building Sector of the Construction Industry.</i></b></u> Dissertation submitted to the Faculty of the Virginia Polytechnic Institute and State University.<br>Cheung, S.O., Ng, T.S.T., Lam, K.C., & Yue, W.M. (2001). A satisfying leadership behavior model for design consultants. </i></b></u><i>International Journal of Project Management, 19</i></b></u>(7), 421 – 429.<br>Cheung, S.O., Ng, T.S.T., Wong, S.P., & Suen, H.C.H. (2003). Behavioral aspects in construction partnering</i></b></u><i>. International Journal of Project Management, 21</i></b></u>(5), 333–343.<br>Dym, C. L., Agogino, A. M., Eris, O., Frey, D.D., & Leifer, L.J. (2005). Engineering Design Thinking, Teaching, and Learning. </i></b></u><i>Journal of Engineering Education</i></b></u>, </i></b></u><i>94</i></b></u>(1), 103 – 120.<br>Gautam, K., & Singh, A. (2010). </i></b></u><i>Personality types of civil engineers and their roles in team performance Challenges, Opportunities and Solutions in Structural Engineering and Construction</i></b></u>. London: Taylor & Francis Group.<br>Gray, C., Hughes, W., & Bennett, J. (1994). </i></b></u><i>The Successful Management of Design</i></b></u>. Reading: The University of Reading.<br>Hendrickson, C. (1998). </i></b></u><i>Project Management for Construction Fundamental Concepts for Owners, Engineers, Architects and Builders</i></b></u>. London: Prentice Hall.<br>Hodgson, D., Paton, S., & Cicmil, S. (2011). Great expectations and hard times: The paradoxical experience of the engineer as project manager. </i></b></u><i>International Journal of Project Management, 29</i></b></u>(4), 374-382.<br>Hoschette, J.A. (2010). </i></b></u><i>The Engineer’s Career Guide.</i></b></u> New Jersey, NJ: John Wiley & Sons.<br>Jackson, D.E. (1988). </i></b></u><i>Interpersonal Communication for Technically Trained Managers: A Guide to Skills and Techniques</i></b></u>. New York, NY: Quorum Books.<br>Koehn, E. (1999). Preparing Students for Engineering Design & Practice. </i></b></u><i>Journal of Engineering Education</i></b></u>, </i></b></u><i>88</i></b></u>(2), 163 -167.<br>Kratzer, J., Leenders, R. T.A.J., & Engelen, J. M.L. V. (2008). The social structure of leadership and creativity in engineering design teams: An empirical analysis. </i></b></u><i>Journal of Engineering and Technology Management, 25</i></b></u>(4), 269–286.<br>Lancaster, P.J. (2001). </i></b></u><i>Construction in Cities Social, Environmental, Political, and Economic Concerns</i></b></u>. Washington, D.C.: CRC Press.<br>Liebing, R. (2001). </i></b></u><i>The construction industry: Processes, players, and practices.</i></b></u> New Jersey, NJ: Prentice Hall.<br>Male, S.A., Bush, M.B., & Chapman, E.S. (2009). Identification of competencies required by engineers graduating in Australia. </i></b></u><i>Proceedings of the 2009 20th Australasian Association for Engineering Education Conference, </i></b></u>882- 887.<br>Maillardet, F.J. (1991). “In search of reality”: the role of design studies in engineering education. </i></b></u><i>European Journal of Engineering Education, 5</i></b></u>(4), 309-318.<br>Mignonac, K., & Herrbach, O. (2003). Managing individual career aspirations and corporate needs: a study of software engineers in France. </i></b></u><i>Journal of Engineering and Technology Management, 20</i></b></u>(3), 205-230.<br>Molen, H. T. V. D., Schmidt, H. G., & Kruisman, G. (2007). Personality characteristics of engineers. </i></b></u><i>European Journal of Engineering Education, 32</i></b></u>(5), 495–501.<br>Moylan, W. A. (2006). Building Ethics in Construction Partnerships: An Analysis of Values-Based Leadership. </i></b></u><i>The International Journal of Knowledge, Culture and Change Management, 6</i></b></u>(6), 81-88. <br>Newport, C. L., & Elms, D. G. (1997). Effective Engineers. </i></b></u><i>International Journal of Engineering Education, 13</i></b></u>(5), 325-332.<br>Oberlender, G.D. (2000). </i></b></u><i>Project Management for Engineering and Construction Second Edition</i></b></u>. New York, NY: Mc Graw – Hill Higher Education.<br>Rynes, S.L., Tolbert, P.S., & Strausser, P.G., 1988. Aspirations to Manage: A Comparison of Engineering Students and Working Engineers. </i></b></u><i>Journal of Vocational Behavior, 32</i></b></u>(2), 239-253.<br>Sears, S.K., Sears, G.A., & Clough, R.H. (2008). </i></b></u><i>Construction Project Management. A Practical Guide to Field Construction Management 5th Edition</i></b></u>. New Jersey, NJ: John Wiley & Sons, Inc.<br>Shen, W., Shen, Q., & Xiaoling, Z. (2012). A user pre-occupancy evaluation method for facilitating the designer-client communication. </i></b></u><i>Facilities, 30</i></b></u>(7), 302 – 323.<br>Thambyah, A. (2011). On the design of learning outcomes for the undergraduate engineer’s final year project. </i></b></u><i>European Journal of Engineering Education, 36</i></b></u>(1), 35-46.<br>Trevelyan, J. (2010). Mind the Gaps: Engineering Education and Practice. </i></b></u><i>Proceedings of the 2010 Australasian Association for Engineering Education Conference, Sydney, </i></b></u>383 – 390.<br>Trigunarsyah, B. (2007). Project designers’ role in improving constructability of Indonesian construction projects. </i></b></u><i>Journal of Construction Management and Economics, 25</i></b></u>(2), 207–215.<br>Watson, J.M., & Meiksins, P.F. (1991). What do engineers want? Work values, job rewards and job satisfaction. </i></b></u><i>Science Technology and Human Values, 16</i></b></u>(2), 140–172.<br>Wells, J. (1986). </i></b></u><i>The Construction Industry in Developing Countries: Alternative Strategies for Development.</i></b></u> London: Taylor & Francis.<br>Xia, B., Chan, A. P.C., & Yeung, J. F.Y. (2009). Identification of key competences of design-builders in the construction market of the People’s Republic of China. </i></b></u><i>Journal of Construction Management and Economics, 27</i></b></u>(11), 1141–1152. <br><p><b>Chapter 8<br></i></b></u><br>Ahlemann, F., Teuteberg, F., & Vogelsang, K. (2009). Project management standards – Diffusion and application in Germany and Switzerland. </i></b></u><i>International Journal of Project Management, 27</i></b></u>(3), 292-303.<br>Ahsan, K., & Gunawan, I. (2010). Analysis of cost and schedule performance of international development projects. </i></b></u><i>International Journal of Project Management, 28</i></b></u>(1), 68-78.<br>Almahmoud, E. S., Doloi, H. K., & Panuwatwanich, K. (2012). Linking project health to project performance indicators: Multiple case studies of construction projects in Saudi Arabia. </i></b></u><i>International Journal of Project Management, 30</i></b></u>(3), 296-307.<br>Anbari, F. T. (2003). Earned value project management method and extensions. </i></b></u><i>Project management journal, 34</i></b></u>(4), 12-23.<br>Anderson, D. K., & Merna, T. (2003). Project Management Strategy–project management represented as a process based set of management domains and the consequences for project management strategy. </i></b></u><i>International Journal of Project Management, 21</i></b></u>(6), <br>387-393.<br>Association for Project Management. (2006). Project Management Body of Knowledge. Fifth Edition., </i></b></u><i>APMBoK</i></b></u>. UK: APM Body of Knowledge; 5th Edition.<br>Baccarini, D. (1999). The Logical Framework Method for Defining Project Success. </i></b></u><i>Project Management Journal, 30</i></b></u>(4), 25-32.<br>Barad, M., & Tzvi., R. (2000). Contribution of quality management tools and practices to project management performance. </i></b></u><i>International Journal of Quality & Reliability Management, 17</i></b></u>(4/5), 571-583.<br>Barclay, C., & Osei-Bryson, K.-M. (2010). Project performance development framework: An approach for developing performance criteria & measures for information systems (IS) projects. </i></b></u><i>International Journal of Production Economics, 124</i></b></u>(1), 272-292.<br>Bredillet, C. N. (2003). Genesis and role of standards: theoretical foundations and socio-economical model for the construction and use of standards. </i></b></u><i>International Journal of Project Management, 21</i></b></u>(6), 463-470.<br>Bryde, D. J. (2005). Methods for managing different perspectives of project success. </i></b></u><i>British Journal of Management, 16</i></b></u>(2), 119-131.<br>Cheung, S. O., Suen, H. C. H., & Cheung, K. K. W. (2004). PPMS: a Web-based construction Project Performance Monitoring System. </i></b></u><i>Automation in Construction, 13</i></b></u>(3), 361-376.<br>Cho, K., Hong, T., & Hyun, C. (2009). Effect of project characteristics on project performance in construction projects based on structural equation model. </i></b></u><i>Expert Systems with Applications, 36</i></b></u>(7), 10461-10470.<br>Cicmil, S., Williams, T., Thomas, J., & Hodgson, D. (2006). Rethinking Project Management: Researching the actuality of projects. </i></b></u><i>International Journal of Project Management, 24</i></b></u>(8), 675-686.<br>Cohen, I., Mandelbaum, A., & Shtub, A. (2004). Multi-project scheduling and control: a process-based comparative study of the critical chain methodology and some alternatives. </i></b></u><i>Project management journal, 35</i></b></u>(6), 39-50.<br>Cooke-Davies, T. (2002). The “real” success factors on projects. </i></b></u><i>International Journal of Project Management, 20</i></b></u>(3), 185-190.<br>Crawford, L. (2004). </i></b></u><i>Global body of project management knowledge and standards</i></b></u>. In P. Morris & J. Pinto (Eds.), </i></b></u><i>The Wiley Guide to Managing Projects</i></b></u>: John Wiley and Sons.<br>Crawford, L., Morris, P., Thomas, J., & Winter, M. (2006). Practitioner development: From trained technicians to reflective practitioners. </i></b></u><i>International Journal of Project Management, 24</i></b></u>(8), 722-733.<br>Crawford, P., & Bryce, P. (2003). Project monitoring and evaluation: a method for enhancing the efficiency and effectiveness of aid project implementation. </i></b></u><i>International Journal of Project Management, 21</i></b></u>(5), 363-373.<br>de Wit, A. (1988). Measurement of project success. </i></b></u><i>International Journal of Project Management, 6</i></b></u>(3), 164-170.<br>Fortune, J., White, D., Jugdev, K., & Walker, D. H. T. (2011). Looking again at current practice in project management. </i></b></u><i>International Journal of Managing Projects in Business, 4</i></b></u>(4), 553-572.<br>Garcia, S. (2005). How standards enable adoption of project management practice. </i></b></u><i>IEEE Software, 22</i></b></u>(5), 22-29.<br>Hiyassat, M. A. S. (2000). Applying the ISO standards to a construction company: a case study. </i></b></u><i>International Journal of Project Management, 18</i></b></u>(4), 275-280.<br>Hodgson, D., & Cicmil, S. (2006). </i></b></u><i>Making Projects Critical</i></b></u> (Vol. 1). Basingstore, UK: Palgrave Macmillan <br>Ika, L. A., Diallo, A., & Thuillier, D. (2010). Project management in the international development industry. The project coordinator’s perspective. </i></b></u><i>International Journal of Managing Projects in Business, 3</i></b></u>(1), 61-93.<br>International Project Management Association. (2006). The IPMA Competence Baseline, </i></b></u><i>ICB 3.0</i></b></u>: International Project Management Association.<br>Jha, K. N., & Iyer, K. C. (2007). Commitment, coordination, competence and the iron triangle. </i></b></u><i>International Journal of Project Management, 25</i></b></u>(5), 527-540.<br>Kim, E. H., Wells, J. W. G., & Duffey, M. R. (2003). A model for effective implementation of Earned Value Management methodology. </i></b></u><i>International Journal of Project Management, 21</i></b></u>(5), 375-382.<br>Lauras, M., Marques, G., & Gourc, D. (2010). Towards a multi-dimensional project Performance Measurement System. </i></b></u><i>Decision Support Systems, 48</i></b></u>(2), 342-353.<br>Ling, F. Y. Y. (2004). How project managers can better control the performance of design-build projects. </i></b></u><i>International Journal of Project Management, 22</i></b></u>(6), 477-488.<br>Lipke, W., Zwikael, O., Henderson, K., & Anbari, F. (2009). Prediction of project outcome. The application of statistical methods to earned value management and earned schedule performance indexes. </i></b></u><i>International Journal of Project Management, 27</i></b></u>(4), 400-407.<br>Luu, V. T., Kim, S.-Y., & Huynh, T.-A. (2008). Improving project management performance of large contractors using benchmarking approach. </i></b></u><i>International Journal of Project Management, 26</i></b></u>(7), 758-769.<br>Marques, G., Gourc, D., & Lauras, M. (2010). Multi-criteria performance analysis for decision making in project management. </i></b></u><i>International Journal of Project Management, In Press, Corrected Proof</i></b></u>.<br>McManus, J., & Wood-Harper, T. (2003). </i></b></u><i>Information systems project management: methods, tools and techniques </i></b></u>(Prentice Hall. Pearson Education Limited ed.).<br>McHugh, O., & Hogan, M. (2011). Investigating the rationale for adopting an internationally-recognised project management methodology in Ireland: The view of the project manager. </i></b></u><i>International Journal of Project Management, 29</i></b></u>(5), 637-646.<br>Milosevic, D., & Patanakul, P. (2005). Standardized project management may increase development projects success. </i></b></u><i>International Journal of Project Management, 23</i></b></u>(3), 181-192.<br>Morris, P. W. G., Jamieson, A., & Shepherd, M. M. (2006). Research updating the APM Body of Knowledge 4th edition. </i></b></u><i>International Journal of Project Management, 24</i></b></u>(6), 461-473.<br>Morris, P. W. G., Patel, M. B., & Wearne, S. H. (2000). Research into revising the APM project management body of knowledge. </i></b></u><i>International Journal of Project Management, 18</i></b></u>(3), 155-164.<br>Norrie, J., & Walker, Derek, H. T. (2004). A balanced scorecard approach to project management leadership. </i></b></u><i>Project management journal, 35</i></b></u>, 47-56.<br>Office of Government Commerce. (2009). Managing Successful Projects with PRINCE2 (Projects in Controlled Environments), </i></b></u><i>PRINCE2</i></b></u><i>R</i></b></u>: The Stationery Office [TSO], [OCG-UK].<br>Pant, I., & Baroudi, B. (2008). Project management education: The human skills imperative. </i></b></u><i>International Journal of Project Management, 26</i></b></u>(2), 124-128.<br>Pillai, A. S., Joshi, A., & Rao, K. S. (2002). Performance measurement of R&D projects in a multi-project, concurrent engineering environment. </i></b></u><i>International Journal of Project Management, 20</i></b></u>(2), 165-177.<br>Plaza, M., & Turetken, O. (2009). A model-based DSS for integrating the impact of learning in project control. </i></b></u><i>Decision Support Systems, 47</i></b></u>(4), 488-499.<br>Prabhakar, G. P. (2008). What is Project Success: A Literature Review. </i></b></u><i>International Journal of Business and Management, 3</i></b></u>(9), 3-10.<br>Project Management Institute. (2005). Practice Standard for Earned Value Management. Newtown Square, Pennsylvania (USA).<br>Project Management Institute. (2008). A guide to the Project Management Body of Knowledge. Fourth Edition, </i></b></u><i>PMBOK</i></b></u><i>R</i></b></u>. Newtown Square, Pennsylvania (USA).<br>Rozenes, S., Vitner, G., & Spraggett, S. (2004). MPCS: Multidimensional Project Control System. </i></b></u><i>International Journal of Project Management, 22</i></b></u>(2), 109-118.<br>Rozenes, S., Vitner, G., & Spraggett, S. (2006). Project Control: Literature Review. </i></b></u><i>Project Management Journal, 37</i></b></u>(4), 5-14.<br></i></b></u>Rutešić, S., Praščević, Ž., & Duranović, P. (2005). Quality criteria for management</i></b></u> of construction projects. </i></b></u><i>Gledišta o kvaliteti pri upravljanju gra cross d sign evinskim projektom, 57</i></b></u>(9), 679-686.<br>Shi, Q. (2011). Rethinking the implementation of project management: A Value Adding Path Map approach. </i></b></u><i>International Journal of Project Management, 29</i></b></u>(3), 295-302.<br>Söderlund, J. (2004). Building theories of project management: past research, questions for the future. </i></b></u><i>International Journal of Project Management, 22</i></b></u>(3), 183-191.<br>Sohail, M., & Baldwin, A. N. (2004). Performance indicators for ‘micro-projects’ in developing countries. </i></b></u><i>Construction Management and Economics, 22</i></b></u>(1), 11-23.<br>Steinfort, P. (2010). </i></b></u><i>Understanding the antecedents of project management best practice-lessons to be learned from aid relief projects.</i></b></u> Unpublished PhD Tesis, School of Property, Construction and Project Management, RMIT University, Melbourne.<br>Steinfort, P., & Walker, D. H. T. (2011). </i></b></u><i>What Enables Project Success: Lessons from Aid Relief Projects</i></b></u>. Newtown Square, PA: Project Management Institute.<br>The International Organization Standardization. (2003). Quality Management Systems – Guidelines for quality management in projects ISO 10006:2003 – UNE 66916. Second edition: Spanish Association for Standardization and Certification.<br>Toor, S.-u.-R., & Ogunlana, S. O. (2008). Critical COMs of success in large-scale construction projects: Evidence from Thailand construction industry. </i></b></u><i>International Journal of Project Management, 26</i></b></u>(4), 420-430.<br>Toor, S.-u.-R., & Ogunlana, S. O. (2010). Beyond the ‘Iron triangle’: Stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects. </i></b></u><i>International Journal of Project Management, 28</i></b></u>(3), 228-236.<br>Van Der Westhuizen, D., & Fitzgerald, E. P. (2005). Defining and measuring project success. In D. Remenyi (Ed.), </i></b></u><i>European Conference on IS Management, Leadership and Governance</i></b></u> (pp. 157-163). Reading, United Kingdom: Academic Conferences Limited.<br>Vandevoorde, S., & Vanhoucke, M. (2006). A comparison of different project duration forecasting methods using earned value metrics. </i></b></u><i>International Journal of Project Management, 24</i></b></u>(4), 289-302.<br>West, J. E. (2002). Standards column. </i></b></u><i>Quality Engineering, 15</i></b></u>(2), 341-346.<br>White, D., & Fortune, J. (2002). Current practice in project management — an empirical study. </i></b></u><i>International Journal of Project Management, 20</i></b></u>(1), 1-11.<br>Whitty, S. J., & Maylor, H. (2009). And then came Complex Project Management (revised). </i></b></u><i>International Journal of Project Management, 27</i></b></u>(3), 304-310.<br>Wi, H., & Jung, M. (2010). Modeling and analysis of project performance factors in an extended project-oriented virtual organization (EProVO). </i></b></u><i>Expert Systems with Applications, 37</i></b></u>(2), 1143-1151.<br>Willis, B. E. (1995). APM project-management body of knowledge: the European view. </i></b></u><i>International Journal of Project Management, 13</i></b></u>(2), 95-98.<br>Wirth, I., & Tryloff, D. E. (1995). Preliminary comparison of six efforts to document the project-management body of knowledge. </i></b></u><i>International Journal of Project Management, 13</i></b></u>(2), 109-118.<br><p><b>Chapter 9<br></i></b></u><br>Adrian J.J. (1993). </i></b></u><i>Construction claims: A quantitative approach. </i></b></u>Champaign: Stipes Publishing.</i></b></u><i><br></i></b></u>Barki H., & Hartwick J. (2001). Interpersonal conflict and its management in information system development.</i></b></u><i> MIS Q, 25(2),</i></b></u> 195-228.</i></b></u><i><br></i></b></u>Barki, H., & Hartwick, J. (2004). Conceptualizing the construct of interpersonal conflict. </i></b></u><i>International Journal of Conflict Management, 15(3),</i></b></u> 216 – 244.</i></b></u><i><br></i></b></u>Basaran, E. (1991). </i></b></u><i>Örgütsel davranı</i></b></u><i>s. </i></b></u>Ankara: Gül Yayınevi.</i></b></u><br>Bumin, B. (1990). </i></b></u><i>Organizasyonlarda çatı</i></b></u><i>s</i></b></u><i>manın yönetimi.</i></b></u> Bizim Büro Basımevi.</i></b></u><br>Cahn, D.D., (1990). </i></b></u><i>Intimates in conflict: A communication perspective. </i></b></u>New Jersey: Lawrence Erlbaum Associates.</i></b></u><i><br></i></b></u>Canary, D.J., Cupach, W.R., & Messman, S.J. (1995). </i></b></u><i>Relationship conflict: Conflict in parent-child, friendship, and romantic relationships. </i></b></u>Thousand Oaks: Sage Publications.<br></i></b></u>Can, H., Asan, Ö. & Aydın, E. (2006). </i></b></u><i>Örgütsel Davranış</i></b></u>, Arıkan Basım Yayım Dağıtım Ltd.Sti, Eylül</i></b></u><br>Cheung, S.O., Yiu Yiu, T., W., & Yeung, S., F. (2006). A study of styles and outcomes in construction dispute negotiation. </i></b></u><i>Journal of Construction Engineering and Management,</i></b></u> August, 805-814</i></b></u><i><br></i></b></u>Cupach, W.R., & Canary, D.J. (2000). </i></b></u><i>Competence in interpersonal conflict. </i></b></u>Waveland Press.</i></b></u><i><br></i></b></u>Devito, J. (1995). </i></b></u><i>The interpersonal communication book</i></b></u> (Tenth Edition). Pearson Education.<br>Dökmen, Ü. (1994). </i></b></u><i>Iletis</i></b></u><i>im çatı</i></b></u><i>s</i></b></u><i>maları ve empati. </i></b></u>Sistem Yayıncılık.</i></b></u><br>Eren, E. (1984). </i></b></u><i>Yönetim psikolojisi. </i></b></u>Istanbul: Istanbul Üniversitesi Isletme Fakültesi Isletme Iktisadi Enstitüsü 30. Yıl Yayınları.</i></b></u><br>Filley, A.C. (1975). </i></b></u><i>Interpersonal conflict resolution. </i></b></u>Glenview, IL: Scott, Foresman.<br>Follett, M. (1940). Constructive conflict. In H. C. Metcalf & L. Urwick (Eds.), </i></b></u><i>Dynamic administration: The collective papers of Mary Parker Follett </i></b></u>(pp. 30-49). New York: Harper & Row.<br>Hofstede, G. (1994). Foreword, U., Kim, Triandis, H.</i></b></u>C., Kağıtçıbaşı, C., Choi, S.C., Yoon, G., (Ed.): </i></b></u><i>Individualism and collectivism: Theory, method and applications</i></b></u>, Thousand Oaks, Sage Publications.<br>Ilban, T. (2008). </i></b></u><i>In</i></b></u><i>ş</i></b></u><i>aat sektöründe çatı</i></b></u><i>ş</i></b></u><i>ma yönetiminin kültürel boyutu</i></b></u>, Yüksek Lisans Tezi, Istanbul: I.T.Ü. Fen Bilimleri Enstitüsü.<br>Jergeas, G., F., & Hartman, F., T. (1994). Contractor’s construction claims avoidance.</i></b></u><i> Journal of Construction Engineering and Management, </i></b></u>120(3), 553-560.</i></b></u><i><br></i></b></u>Kassab, M., Hipel, K., & Hegazy, T. (2006). Conflict resolution in construction disputes using the graph model. </i></b></u><i>Journal of Construction Engineering and Management,</i></b></u> October, 1043-1052.</i></b></u><i><br></i></b></u>Kaushal, R. & Kwantes, T. C. (2006). The role of culture and personality in choice of conflict management strategy. </i></b></u><i>International Journal of Intercultural Relations, 30, </i></b></u>579–603.</i></b></u><i><br></i></b></u>Kumaraswamy, M.M., & Yogeswaran K. (1998). Significant sources of construction claims.</i></b></u><i> International Construction Law Review,</i></b></u> 15(1), 144-160.</i></b></u><i><br></i></b></u>Lulofs, R.,S., & Cahn, D.,D. (2000). </i></b></u><i>Conflict from theory to action. </i></b></u>Boston: Allyn and Bacon.<br>Mayer, B. (2000). </i></b></u><i>The dynamics of conflict resolution. </i></b></u>San Francisco: Jossey-Bass.<br>Nightingale D. (1977). </i></b></u><i>Conflict and conflict resolution</i></b></u>. Ed. H.C. Jain and R.N. Kanungo, </i></b></u><i>Behavioral issues’ in management.</i></b></u> Torento: Mc Graw Hill Ryerson Ltd.<br>Pondy, L.R. (1972). </i></b></u><i>Organizational conflict. </i></b></u>NY: Mc Graw Hill Book Co.<br>Pondy, L.R. (1973). Örgütsel uyus</i></b></u>mazlık. kavramlar ve modeler. </i></b></u><i>Bitia Dergisi</i></b></u>, 2 (1), 364.<br>Rahim M., A., & Blum A., A. (1994). </i></b></u><i>Global perspectives on organizational conflict. </i></b></u>Green wood: Westport.</i></b></u><i><br></i></b></u>Sarı, S. (</i></b></u>2005). </i></b></u><i>Ilkö</i></b></u><i>ğ</i></b></u><i>retim bes</i></b></u><i>inci sınıf öğrencilerine çatı</i></b></u><i>s</i></b></u><i>ma çözümü becerilerinin kazandırılmasında akademik çeli</i></b></u><i>ski, de</i></b></u><i>ğer çizgisi ve güdümlü tartı</i></b></u><i>sma yöntemlerinin etkisi. </i></b></u>Adana:</i></b></u><i> </i></b></u>Çukurova Üniversitesi Sosyal Bilimler Enstitüsü Ilköğretim</i></b></u><i> </i></b></u>Anabilim Dalı Yüksek Lisans Tezi.</i></b></u><i><br></i></b></u>Semple, C., Hartman F.T., & Jergeas G. (1994). Construction claims and disputes: Causes and cost/time overruns. </i></b></u><i>Journal of Construction Engineering Management, 120(4),</i></b></u> 785-195.</i></b></u><i><br></i></b></u>Singelis, T. M. (1994). The Measurement of independent and interdependent self-construals. </i></b></u><i>Personality and Social Psychology Bulletin, 20(5),</i></b></u> 580-591.<br>Stooner, J.E. & Freeman R.E. (1989). </i></b></u><i>Management </i></b></u>(fourth edition).</i></b></u><i> </i></b></u>New Jersey: Prentice Hall.<br>Sweeney, B., & Carruthers, W., L. (1996). Conflict resolution: history, philosophy, theory and educational applications. </i></b></u><i>School Counselor, 43(5),</i></b></u> 326-344.</i></b></u><i><br></i></b></u>Sahin, A., Emini, F., & Ünsal, Ö. (</i></b></u>2006). Çatı</i></b></u>sma yönetimi yöntemleri ve hastane örgütlerinde bir uygulama.</i></b></u><i> Selçuk Üniversitesi Sosyal Bilimler Enstitüsü Dergisi, 15,</i></b></u> 567.</i></b></u><i><br></i></b></u>Thomas, K. (1976). Conflict and conflict management. In W.K. Hoy and C.G. Miskel (Eds.), </i></b></u><i>Educational Administration: Theory, Research, Practice</i></b></u> (pp. 100-102). New York: McGraw-Hill, 1991.<br>Tjosvold, D., Cho, Y., Liu, C., Liu, W., & Sasaki, S. (2001). Interdependence and managing conflict with sub-contractors in the construction industry in East Asia.</i></b></u><i> Asia Pacific Journal of Management, 18,</i></b></u> 295-313.</i></b></u><i><br></i></b></u>Tsai, J., & Chi, C.S.F. (2009). Influences of Chinese cultural orientations and conflict management styles on construction dispute resolving strategies.</i></b></u><i> Journal of Construction Engineering and Management, October,</i></b></u> 955-964.</i></b></u><i><br></i></b></u>Uysal, I. (2004)</i></b></u><i> Örgütsel Çatısma Yönetimi ve Türkiye Cumhuriyeti Merkez Bankası’na Yönelik Bir Uygulama</i></b></u>, Merkez Bankası Uzmanlık Tezi.</i></b></u><br>Üngüren, E. (2009).</i></b></u> Çalı</i></b></u>s</i></b></u>ma hayatında örgütsel çatı</i></b></u>sma: Konaklama isletmeleri üzerinde bir aras</i></b></u>tırma, </i></b></u><i>Çalısma ve Toplum 2009/1.</i></b></u><u><br></i></b></u>Wall, J.A., & Callister, R.R. (1995). Conflict and its management.</i></b></u><i> Journal of Management, 21(3),</i></b></u> 515-558.<br>Wasti,S.A. & Erdil,S.E. (2007). </i></b></u><i>Bireycilik ve toplulukçuluk değerlerinin ölçülmesi.</i></b></u> Benlik Kurgusu (Self Construal Scale; SCS) ve INDCOL Ölçeklerinin Türkçe Geçerlemesi,15. Ulusal Yönetim ve Organizasyon Kongresi.<br><p><b>Chapter 10<br></i></b></u><br>Avi-Yonah, R. S. and Uhlmann, D. M. (2009). “Combating Global Climate Change: Why a Carbon Tax is a Better Response to Global Warming than Cap and Trade,” Stanford Environmental Law Journal, 28(3).<br>Baumol, W. J. (1972). “On Taxation and the Control of Externalities,” </i></b></u><i>American Economic Review</i></b></u> 62 (3): 307–322.<br>Bureau (2010). “Unemployed Persons by Industry,” Bureau of Labor Statistics, www.bls.gov/.<br>Coase, R. H. (1960). “The Problem of Social Cost.” Journal of Law and Economics 3 (1): 1–44. <br>Cowling, S. A, Betts, R. A., Cox, P. M., Ettwein, V. J., Jones, C. D., Maslin, M. A., & Spall, S. A. (2004). </i></b></u><i>Contrasting simulated past and future responses of the Amazonian forest to atmospheric change</i></b></u>. Philosophical Transactions of the Royal Society. 359:539-47.<br>Flannery, T. (2005). </i></b></u><i>The Weather Makers</i></b></u>, HarperCollins, Toronto, Ontario.<br>Hilsenrath, J. (2009). “Cap-and-Trade’s Unlikely Critics: Its Creators,” Wall Street Journal, August 13, 2009. http://online.wsj.com/article/SB125011380094927137.html.<br>IPCC (2001). Climate Change 2001: Working Group II: </i></b></u><i>Impacts, Adaptation and Vulnerability</i></b></u>. http://www.grida.no/climate/ipcc_tar/wg2/005.htm.<br>IPCC (2007a). Working Group I Report </i></b></u><i>The Physical Science Basis</i></b></u>,” Chapter 3, </i></b></u><i>Observations: Surface and Atmospheric Climate Change.</i></b></u> www.ipcc.ch/publications_and_data/ar4/wg1/en/contents.html.<br>IPCC (2007b) Working Group III: Mitigation of Climate Change, D. Mitigation in the long term (after 2030). http://www.ipcc.ch/publications_and_data/ar4/wg3/en/spm-ensspm-d.html.<br>Kaplan, S. (2008), CRS Report for Congress, “Power Plants: Characteristics and Costs,” November 13, 2008 http://www.fas.org/sgp/crs/misc/RL34746.pdf.<br>Lieberman, J. & Warner, R. M., (2008) “S.3036 – Lieberman-Warner Climate Security Act of 2008.” http://www.opencongress.org/bill/110-s3036/show.<br>Mann, R. (2002). “Waiting to Exhale? Global Warming and Tax Policy,” American University Law Review, (51):1135-1222. <br>Meteorological Office (2005). </i></b></u><i>International Symposium on the Stabilisation of Greenhouse Gases: Tables of Impacts.</i></b></u> Hadley Centre, Met Office, Exeter, UK.<br>Meyer, A. (2000). </i></b></u><i>“Contraction and Convergence: The Global Solution to Climate Change”</i></b></u> Schumacher Briefings 5, published by Green Books on behalf of the Schumacher Society.<br>Monbiot, G., (2007). </i></b></u><i>Heat: How to Stop the Planet from Burning</i></b></u>, Doubleday Canada.<br>Montopoli, B. (2012). </i></b></u><i>Has Obama declared a “war on coal?,”</i></b></u> CBS News, July 16, 2012. <br>NRDC (2005). Available at www.nrdc.org/international/copenhagenaccords/, National Resources Defense Council.<br>Parry, M. (2001). </i></b></u><i>Millions at Risk: Defining Critical Climate Change Threats and Targets</i></b></u>, Global Environmental Change, 11: 181-3.<br>Pearce, F. (2005). </i></b></u><i>Cities may be abandoned as salt water invades</i></b></u>, Proceedings of the Conference of the International Association of Hydrogeologists, 16th April 2005, New Scientist.<br>Pigou, A. C. (1920). </i></b></u><i>The Economics of Welfare</i></b></u>. London: Macmillan.</i></b></u><u> <br></i></b></u>UK (2000), 2000, </i></b></u><i>Energy: The Changing Climate</i></b></u>, Royal Commission on Environmental Pollution.<br>US EPA (2012). Draft Inventory of US Greenhouse Gas Emissions and Sinks: 1990-2010, Environmental Protection Agency.<br>Vincent, J. (2012). </i></b></u><i>Carbon Capture A Costly Pipe Dream.</i></b></u> Available at http://newmatilda.com<br>Waggoner, M. (2009). “Why and How to Tax Carbon,” Colorado Journal International Environmental Law and Policy.<br>Waxman, H.A. & Markey, E. J. (2009). “H.R. 2454, The American Clean Energy and Security Act (Waxman-Markey),” U.S. Library of Congress. http://hdl.loc.gov/loc.uscongress/legislation.111hr2454.<br>WDR (2010). World Development Report: Development and Climate Change, available at siteresources.worldbank.org.World Bank. (2007) “Cost of Pollution in China: Economic Estimates of Physical Damages.” Washington DC.